DCR Announces Scaled-Back Memorial Drive Road Diet for 2024
The latest proposal, as described in the ENF, would reconstruct a 0.8-mile length of Memorial Drive and its multi-use pathways between the Eliot Bridge and the Anderson Bridge (JFK Street).
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed